Please be sure to read this information on a regular basis.
Lead and Copper Corrosion Control Installation Failure
Lead and Copper Corrosion Control Installation Failure
Lead and Copper Corrosion Control Installation Failure
USCDWUA DOES NOT have any lead pipes or fixtures in the system. Two times a year
USCDWUA is required to sample twenty (20) sites that were built between 1981 and
1988. During our 1st testing of 2023, several of the sites came back over the EPA Lead
Action Level of 0.015 mg/L. USCDWUA will now be required install corrosion control
treatment to raise the pH of the water. We are working with an engineer to submit
treatment design plans to CDPHE (Colorado Department of Public Health &
Environment) and have treatment installed by May 2024.
USCDWUA is fulfilling all the requirements from CDPHE.
If you feel that you need to get your water tested please click on the link below to go to the CDPHE website and follow the instructions.
https://docs.google.com/forms/d/e/1FAIpQLSePs4hDHh0qfU54DpeEJF8ThcwrxV3w1tzsxRR7mhVQMx7OVg/viewform
The board meets every 2nd Monday of the month at 6: 30 p.m.
Redlands Mesa
Debbie Christner - President
Bryan Klaseen
Upper Surface Creek
Steve Hanson
John Walker
Cedar Mesa
Ken Besel
Travis Holton
Member At Large
Kacy Stillings - Vice President
Amber McPherson - Office Manager, (Secretary - Treasurer)
Kurtis Jones - Operations Manager
Charles Moore - Plant Operator
Timothy Frey - Water Operator
Jedediah Poulson - Water Operator
Our water acquisition policy is paid at the time of tap purchase; the installation fee pays for the meter, the meter pit, and installation at the main line.
All excavation and service line construction is the responsibility of the owner.
Membership Fee $10,000.00
Installation Fee $1,500.00
Transfer Fee $50.00
Meter Reading Dates: Cycle 1: 18-20; Cycle 2: 20-22; Cycle 3: 22-24; Cycle 4: 24-26; Cycle 5: 26-28
Up to 7,500 gal/month (245 gal/day) $60.00
7,501-13,000 gal/month (246-427 gal/day) $1.00/1,000 gal
13,001-20,000 gal/month (428-655 gal/day) $1.50/1,000 gal
20,001-30,000 gal/month (656-983 gal/day) $2.00/1,000 gal
30,001-40,000 gal/month (984-1311 gal/day) $4.00/1,000 gal
40,001-50,000 gal/month (1312-1639 gal/day) $8.00/1,000 gal
Over 50,000 gal/month (Over 1,640 gal/day) $10.00/1,000
Gallons Per Month Amount
7,500 $60.00
13,000 $65.50
20,000 $76.00
25,000 $86.00
30,000 $96.00
40,000 $136.00
45,000 $176.00
50,000 $216.00
55,000 $266.00
(Figures will vary due to number of days between readings)
We love our customers, so feel free to visit during normal business hours. Our mailing address is:
USCDWUA
P.O. Box 70
Cedaredge, CO 81413
Monday - Friday 11 a.m. - 3 p.m.
or by Appointment
Copyright © 2024 USCDWUA - All Rights Reserved.
Powered by GoDaddy Website Builder